Yamba Hearts Center
Yamba Hearts Center is the heart of our work, a place that has developed tremendously thanks to your amazing donations. 💛
Today, the center consists of:
🏠 The main building, with 3 bedrooms, a classroom, an extra teaching room, and a large gathering hall that is also used as a classroom.
💧 In 2021, electricity and a water tank were installed to improve living conditions.
On the enclosed grounds, you’ll find:
🍴 An outdoor kitchen
🚻 Two toilets
🏫 Two temporary classrooms
Over the past years, the center has continued to expand:
✔️ Spring 2023: A new building with three large classrooms was constructed.
✔️ Spring 2024: Another building with three additional classrooms was added, and solar panels were installed on the main building. This has solved the problem of frequent power outages and provided stability for both the center and the school.
✔️ Spring 2025: Two new latrines will be completed, and a new wooden building will be constructed for additional classrooms. Windows and doors will also be installed in the classrooms built in 2024.
All permanent buildings are made of bricks that Charles produced between 2016 and 2019.


Inside and outside the main building in 2024.

Image from the upper part of the centre in 2025.